Power Shutdown in Viluppuram – Tuesday (26-05-2026)

Power supply will be suspended in the following areas on Tuesday (26-05-2026) from 09.00 AM to 04.00 PM due to scheduled maintenance works.

Madurapakkam(MADURAPAKKAM 110 KV SS Substation): Madhurapakkam,Chithalampattu,Kodukkur,Vizhvarettipalayam,Seiyathu Vinnan, Vakkur, Siruvallikuppam, Thoravi, Munkilpattu,T.V.Pattu, Mathur, Nagari,Muthaliyarkuppam,Kumalam, Pagandai, Mutrampattu,Nerku.

Power supply will be restored before 04.00 PM if the maintenance work is completed early. The shutdown schedule may change depending on operational requirements.

Share Article

Copyright © 2025 Viluppuram.in, All Rights Reserved.

Powered by J B Soft System, Chennai.